But ba Study guides, Class notes & Summaries
Looking for the best study guides, study notes and summaries about But ba? On this page you'll find 1054 study documents about But ba.
Page 2 out of 1.054 results
Sort by
-
LEG2601 EXAM PACK 2023
- Exam (elaborations) • 131 pages • 2023
-
- $2.77
- 2x sold
- + learn more
LEG2601 
Legal Aspects of Environmental Management 
100 Marks 
24 Hours 
THIS PAPER CONSISTS OF 6 (SIX) PAGES – INCLUDING INSTRUCTIONS. 
Honesty Declaration: 
In writing and submitting this paper you affirm that: 
1. You understand what academic dishonesty entails and are aware of UNISA’s policies 
in this regard. 
2. You have not allowed, and will not allow, anyone to copy your work with the intention 
of passing it off as his or her own work. 
3. You did not make use of another ...
-
Salesforce Certified Business Analyst Exam Practice - Q & A (Complete Solutions)
- Exam (elaborations) • 41 pages • 2024
- Available in package deal
-
- $27.49
- + learn more
Salesforce Certified Business Analyst Exam Practice - Q & A (Complete Solutions) Northern Trail Outfitters (NTO) has acquired a competitor. The agreement is to migrate the acquired company into NTG's Technological Platforms. One of its challenges is to offer a unified customer experience while strengthening the relationship with its customers. The business analyst (BA) has been asked to translate the business objectives and assemble an improved and standard customer experience. Which strategy...
-
NERC Test Questions with correct answers
- Exam (elaborations) • 28 pages • 2023
- Available in package deal
-
- $15.99
- + learn more
What percentage of load gives a 1 Hz change in an island condition? CORRECT ANSWER 6-10% (Think 6-10 day island vacation) 
 
If ACE is Zero but system Hz is off, what should a system operator do? CORRECT ANSWER Nothing! ACE bias and interchange schedule will improve frequency 
 
If ACE is Zero, why not adjust generation to help frequency? CORRECT ANSWER Could overload equipment, this is a NERC violation 
 
When restoring from blackout condition, what should be done with load? CORRECT ANSWER All ...
-
Defense Acquisition University: ACQ- ACQ 1010 All modules Exams.
- Other • 40 pages • 2022
-
- $17.49
- 9x sold
- + learn more
Defense Acquisition University: ACQ- ACQ 1010 All modules Exams 1-10 Answered and graded 100% score; Latest Fall 2022. 
Test – ACQ 1010 Module 1 Exam: Systems Acquisition Management Overview 
1. Select the Department of Defense’s (DoD’s) decision-support system described as: “this is the 
process by which the Department of Defense (DoD) identifies, assesses and prioritizes the 
capabilities the military requires to fulfill its mission and is often referred to as the requirements 
generat...
-
NERC book quiz Questions and Answers (100% Correct Elaborations)
- Exam (elaborations) • 29 pages • 2023
- Available in package deal
-
- $10.49
- + learn more
You are an external BA with a frequency bais of 20 MW/.1 Hz that sees a frequency of 60.02 due to a large loss of load in the contingent BA. If your generator governor control systems responded to the frequency deviation approximately how much of a generation change would you BA experience? 
-4MW 
 
 
Net actual interchange minus Net scheduled interchange is what? 
Inadvertent interchange 
 
 
Suppose your interconnection operators at 59.97 Hz from one minute after midnight to noon and operate a...
Get paid weekly? You can!
-
Practice Test NERC Questions and Correct Answers (GRADED A+)
- Exam (elaborations) • 48 pages • 2023
- Available in package deal
-
- $11.99
- + learn more
A transmission line is operating with a voltage phase angle different of 30 degrees between the sending Vs and the receiving bus Vr. If the receiving end load is suddenly increased, the voltage phase angle difference will be? 
The phase angle will increase. When load is increased phase angle will increase. 
 
 
A load has a power factor of 0.9 lagging. If the load draws 100 MVA, what is the MW draw? 
90 pf= mw/mva 
 
 
The high side of a delta-wye connection transformer is connected to a power s...
-
NERC RC Exam (Latest Update 2024) Questions and Answers
- Exam (elaborations) • 17 pages • 2023
- Available in package deal
-
- $10.99
- + learn more
Common standard time period for station battery to handle outage of AC power to chargers 
8-12 hours 
 
 
Time to restore data exchange redundancy when redundancy testing by RC/TOP/BA deemed unsuccessful 
2 hours 
 
 
Transition period to backup control facility (fully functioning) 
2 hours 
 
 
Annual testing of backup control facility must prove to be functional for this long 
2 hours 
 
 
Every 2 years TO/TOP/DSP must provide how many hours of system restoration training to field switching pe...
-
Elsevier Adaptive Quizzes with Complete Solutions Already Passed
- Exam (elaborations) • 22 pages • 2023
- Available in package deal
-
- $12.49
- + learn more
A radiologic technologist is working on barium and iodine. Which term does the 
radiologic technologist use to refer to 134/56 Ba and 131/53 I ? 
a. Isobar 
b. Isomer 
c. Isotope 
d. Isotone - Correct d. Isotone 
Isotones differ in their atomic numbers and mass numbers, but they have the same 
number of neutrons, that is, a constant for the quantity a (atomic number) - z (mass 
number) a-z. 
Types of ionizing radiation used in various techniques have different ranges of 
penetrability into the s...
-
NERC Final Exam Practice Questions and Answers | Latest Updated 2023-2024 | 100% Verified
- Exam (elaborations) • 15 pages • 2023
- Available in package deal
-
- $14.49
- + learn more
NERC Final Exam Practice Questions and Answers | Latest Updated 2023-2024 | 100% Verified. BAL-002 default contingency reserve restoration period (following disturbance recovery period) 
90 minutes 
How often should BA calculate and record inadvertent interchange 60 minutes/hourly 
How often should BA provide MW-hour meter readings to adjacent BA's 60 minutes/hourly 
TLR procedure (identifying TLR level and actions to be implemented) needs updating how often 
60 minutes/hourly 
Hourly ATC for n...
-
NERC Test 222 Questions and Answers (with 100% Correct Solutions)
- Exam (elaborations) • 33 pages • 2023
- Available in package deal
-
- $11.99
- + learn more
What percentage of load gives a 1 Hz change in an island condition? 6-10% (Think 6-10 day island vacation) If ACE is Zero but system Hz is off, what should a system operator do? Nothing! ACE bi as and interchange schedule will improve frequency If ACE is Zero, why not adjust generation to help frequency? Could overload equipment, this is a NERC violation When restoring from blackout condition, what should be done with load? All load breakers should be opened, load should be restored in a control...