Sophiee12312
On this page, you find all documents, package deals, and flashcards offered by seller sophiee12312.
- 90
- 1
- 12
Community
- Followers
- Following
48 Reviews received
102 items
Building regulatory control of town planning and building regulations
The following report, of task one, will be covering all aspects regarding the NPPF (National Policy Planning Framework) how Dee Park has met the 13 guidance criteria of the policy. Task two will cover the use of RIBA, the building regulations application and how they work with the 7 stages of RIBA. Task three will provide a brief analysis of The Approved Document B and Grenfell Tower. Analysing how Grenfell Tower complied with the regulations stated in Document B.

UWL
- Essay
- • 38 pages •
The following report, of task one, will be covering all aspects regarding the NPPF (National Policy Planning Framework) how Dee Park has met the 13 guidance criteria of the policy. Task two will cover the use of RIBA, the building regulations application and how they work with the 7 stages of RIBA. Task three will provide a brief analysis of The Approved Document B and Grenfell Tower. Analysing how Grenfell Tower complied with the regulations stated in Document B.

UWL
Building regulatory control of health and safety in the construction industry
Accidents within the construction industry have continued to be a concern and threat on and international scale.The concern is due to construction having the highest rates of accidents in many countries.(Camino López, Ritzel, Fontaneda, & González Alcantara, 2008)[1] The injuries and deaths that occur from accidents in construction force a high cost on the construction industry.[2](Pearce, 2003)
 In conclusion, from 2003 to 2016 an estimate of 3,414 suffered from a fatality at work in Austra...
- Essay
- • 24 pages •
Accidents within the construction industry have continued to be a concern and threat on and international scale.The concern is due to construction having the highest rates of accidents in many countries.(Camino López, Ritzel, Fontaneda, & González Alcantara, 2008)[1] The injuries and deaths that occur from accidents in construction force a high cost on the construction industry.[2](Pearce, 2003)
 In conclusion, from 2003 to 2016 an estimate of 3,414 suffered from a fatality at work in Austra...
Unit 34 Website Design Strategy
achieved all up to distinction:)
- Package deal
- • 11 items •
- Unit 34 Website Design Strategy P1 • Essay
- Unit 34 Website Design Strategy P2 • Essay
- Unit 34 Website Design Strategy P3 • Essay
- Unit 34 Website Design Strategy P4 • Essay
- Unit 34 Website Design Strategy P5 • Essay
- And more ….
achieved all up to distinction:)
Unit 34 Website Design Strategy D2
distinction
- Package deal
- Essay
- • 3 pages •
Unit 34 Website Design Strategy M3
merit
- Package deal
- Essay
- • 3 pages •
Unit 34 Website Design Strategy M2
merit
- Package deal
- Essay
- • 3 pages •
Unit 34 Website Design Strategy M1
merit
- Package deal
- Essay
- • 4 pages •
Unit 34 Website Design Strategy P6
passed
- Package deal
- Essay
- • 2 pages •
Unit 34 Website Design Strategy P5
passed
- Package deal
- Essay
- • 3 pages •
Unit 34 Website Design Strategy P4
passed
- Package deal
- Essay
- • 5 pages •
Unit 10 M1 and M2 market research in business
unit 33 p4
unit 9 d2
unit 9 p3
unit 9 p4
Really good detail, thinks of practically everything, very happy with my purchase, However, my assingment hasnt been graded yet so tbc if its 100%