Module 6 nccer Study guides, Class notes & Summaries

Looking for the best study guides, study notes and summaries about Module 6 nccer? On this page you'll find 167 study documents about Module 6 nccer.

Page 3 out of 167 results

Sort by

module 6 NCCER Exam/14 Questions and Answers
  • module 6 NCCER Exam/14 Questions and Answers

  • Exam (elaborations) • 1 pages • 2024
  • module 6 NCCER Exam/14 Questions and Answers
    (0)
  • $7.49
  • + learn more
Module 6 NCCER into to Basic rigging with questions & correct answers already graded A+
  • Module 6 NCCER into to Basic rigging with questions & correct answers already graded A+

  • Exam (elaborations) • 7 pages • 2024
  • Module 6 NCCER into to Basic rigging with questions & correct answers already graded A+ An example of a _____________ a synthetic slings has a missing identification tag and it has been puncture and crushed. - ANSWER>>(rejection criteria) A ______________ is part of the sling that reaches attachment device around the object being lifted. - ANSWER>>(sling leg) If the _____________ is showing , the sling is not safe for use. - ANSWER>>(warning yarn) On a crane , a grooved pul...
    (0)
  • $13.89
  • + learn more
NCCER Module 6 into to Basic rigging  2023 ALL50+questions with correct  answers AGRADE During a rigging operation if an emergency happens who has the authority to give theemergency stop  hand signal? -
  • NCCER Module 6 into to Basic rigging 2023 ALL50+questions with correct answers AGRADE During a rigging operation if an emergency happens who has the authority to give theemergency stop hand signal? -

  • Exam (elaborations) • 7 pages • 2023
  • Available in package deal
  • NCCER Module 6 into to Basic rigging 2023 ALL50+questions with correct answers AGRADE During a rigging operation if an emergency happens who has the authority to give theemergency stop hand signal? - CORRECT ANSWER-(Anyone on the ground who is in sight of the craneoperator). The recommendation when lifting a load longer then __________ is to use two chokerhitches. - C
    (1)
  • $16.59
  • + learn more
NCCER Module 6 Questions and Answers 100% Pass Updated | Download to score A+
  • NCCER Module 6 Questions and Answers 100% Pass Updated | Download to score A+

  • Exam (elaborations) • 13 pages • 2024
  • NCCER Module 6 Questions and Answers 100% Pass Updated | Download to score A+
    (0)
  • $12.49
  • + learn more
NCCER Electrical Level 2 Module 6 Questions with 100% Correct Answers | Updated & Verified
  • NCCER Electrical Level 2 Module 6 Questions with 100% Correct Answers | Updated & Verified

  • Exam (elaborations) • 9 pages • 2024
  • NCCER Electrical Level 2 Module 6 Questions with 100% Correct Answers | Updated & Verified
    (0)
  • $12.49
  • + learn more
NCCER Module 6 (Construction Class) Questions and Answers 100% Pass Updated | Download to score A+
  • NCCER Module 6 (Construction Class) Questions and Answers 100% Pass Updated | Download to score A+

  • Exam (elaborations) • 11 pages • 2024
  • NCCER Module 6 (Construction Class) Questions and Answers 100% Pass Updated | Download to score A+
    (0)
  • $12.49
  • + learn more
Module 6 NCCER into to Basic rigging questions with correct answers
  • Module 6 NCCER into to Basic rigging questions with correct answers

  • Exam (elaborations) • 6 pages • 2024
  • During a rigging operation if an emergency happens who has the authority to give theemergency stop hand signal? - answer-(Anyone on the ground who is in sight of the craneoperator). The recommendation when lifting a load longer then __________ is to use two chokerhitches. - answer-(12 feet) A hand-operated winching device that should never be used for vertical overhead liftingis a ( - answer-come-along All chain hoists use a ____________ to lift heavy loads. - an...
    (0)
  • $10.99
  • + learn more
NCCER module 6 (intro to basic rigging) Questions and Answers (Download To Score An A)
  • NCCER module 6 (intro to basic rigging) Questions and Answers (Download To Score An A)

  • Exam (elaborations) • 2 pages • 2024
  • NCCER module 6 (intro to basic rigging) Questions and Answers (Download To Score An A)
    (0)
  • $10.49
  • + learn more
NCCER module 6 (intro to basic rigging) Questions and Answers (Download To Score An A)
  • NCCER module 6 (intro to basic rigging) Questions and Answers (Download To Score An A)

  • Exam (elaborations) • 2 pages • 2024
  • NCCER module 6 (intro to basic rigging) Questions and Answers (Download To Score An A)
    (0)
  • $10.49
  • + learn more
Module 6 NCCER Rigging Questions and Answers
  • Module 6 NCCER Rigging Questions and Answers

  • Exam (elaborations) • 5 pages • 2024
  • Module 6 NCCER Rigging Questions and Answers Synthetic fibers, cast iron links, and wire rope. Slings are commonly made out of? Removed from service immediately. If the identification tag on a synthetic sling is missing or illegible, the sling must be? Body The size of the shackle is determined by the diameter of its? Hoist A type of rigging equipment that uses a pulley system to provide a mechanical advantage for lifting a load is a? Choker hitch When a load has no at...
    (0)
  • $10.19
  • + learn more