Nerc rc Study guides, Class notes & Summaries

Looking for the best study guides, study notes and summaries about Nerc rc? On this page you'll find 315 study documents about Nerc rc.

All 315 results

Sort by

NERC Final Assessment Exam Correct answers (Already GRADED A) Popular
  • NERC Final Assessment Exam Correct answers (Already GRADED A)

  • Exam (elaborations) • 98 pages • 2023
  • Available in package deal
  • When using a dynamic schedule and the energy profile in an hour is >250 MW and the actual hourly integration deviates from the hourly energy profile by ____ the tag must be modified. A. 100 MW B. 10% C. 50 MW D. 25% B. 10% Dry steam plants, flash steam plants, and binary cycle power plants are the three main types of what kind of generating plant? A. Nuclear generators B. Combustion turbine generators C. Geothermal generators D. Hydroelectric generators C. Geothermal generators...
    (1)
  • $11.99
  • 1x sold
  • + learn more
NERC Prep - Bal, Int, & Trans Exam Questions and Answers 2023-2024 Graded A+ Popular
  • NERC Prep - Bal, Int, & Trans Exam Questions and Answers 2023-2024 Graded A+

  • Exam (elaborations) • 22 pages • 2023 Popular
  • Available in package deal
  • NERC Prep - Bal, Int, & Trans Exam Questions and Answers Graded A+. What group can approve a change in the Disturbance Recovery Period for an Interconnection? a. NERC Interconnection Working Group b. NERC Operating Committee c. NERC Regional Council d. NERC Disturbance Analysis Working Group c. Check targets and equipment - What is the first thing an operator should do after a relay operation? a. Check power system stabilizers b. Notify adjacent Transmission and Balancing areas c. Che...
    (0)
  • $15.49
  • 1x sold
  • + learn more
NERC RC TEST 64 QUESTIONS WITH COMPLETE SOLUTIONS
  • NERC RC TEST 64 QUESTIONS WITH COMPLETE SOLUTIONS

  • Exam (elaborations) • 4 pages • 2022
  • Available in package deal
  • System studies identify what correct answer: Predict operations and identify constraints If ACE remains the same and frequency goes up what has happened? correct answer: Someone lost load When a generator has its AVR in service it is a? correct answer: Dynamic source of reactive power Black start resource testing is done every? correct answer: 3 years Each BA shall operate its AGC on? correct answer: Tie line Frequency Bias When is voltage reduction reportable? correct answer...
    (0)
  • $5.49
  • 1x sold
  • + learn more
NERC RC Exam (Latest Update 2024) Questions and Answers
  • NERC RC Exam (Latest Update 2024) Questions and Answers

  • Exam (elaborations) • 17 pages • 2023
  • Available in package deal
  • Common standard time period for station battery to handle outage of AC power to chargers 8-12 hours Time to restore data exchange redundancy when redundancy testing by RC/TOP/BA deemed unsuccessful 2 hours Transition period to backup control facility (fully functioning) 2 hours Annual testing of backup control facility must prove to be functional for this long 2 hours Every 2 years TO/TOP/DSP must provide how many hours of system restoration training to field switching pe...
    (0)
  • $10.99
  • + learn more
NERC RC EXAM 2024-2025 WITH 150  QUESTIONS AND CORRECT ANSWERS/  NERC RC REAL EXAM QUESTIONS AND  ANSWERS GRADED A+ (BRAND NEW!!)
  • NERC RC EXAM 2024-2025 WITH 150 QUESTIONS AND CORRECT ANSWERS/ NERC RC REAL EXAM QUESTIONS AND ANSWERS GRADED A+ (BRAND NEW!!)

  • Exam (elaborations) • 18 pages • 2024
  • Available in package deal
  • NERC RC EXAM WITH 150 QUESTIONS AND CORRECT ANSWERS/ NERC RC REAL EXAM QUESTIONS AND ANSWERS GRADED A+ (BRAND NEW!!) Once BA/TOP notifies RC of emergency conditions, RC has how long to notify other BA/TOP's and neighboring RC's - ANSWER-30 minutes
    (0)
  • $20.99
  • + learn more
NERC RC EXAM
  • NERC RC EXAM

  • Exam (elaborations) • 11 pages • 2024
  • NERC RC EXAM
    (0)
  • $12.49
  • + learn more
NERC RC Exam (times-percentages-values) Qs&As
  • NERC RC Exam (times-percentages-values) Qs&As

  • Exam (elaborations) • 10 pages • 2024
  • Available in package deal
  • NERC RC Exam (times-percentages-values) Qs&As Common standard time period for station battery to handle outage of AC power to chargers - 8-12 hours Time to restore data exchange redundancy when redundancy testing by RC/TOP/BA deemed unsuccessful - 2 hours Transition period to backup control facility (fully functioning) - 2 hours Annual testing of backup control facility must prove to be functional for this long - 2 hours Every 2 years TO/TOP/DSP must provide how many hours of system resto...
    (0)
  • $13.19
  • + learn more
NERC RC Exam (times/percentages/values) 2024 Graded A+
  • NERC RC Exam (times/percentages/values) 2024 Graded A+

  • Exam (elaborations) • 6 pages • 2024
  • NERC RC Exam (times/percentages/values) 2024 Graded A+
    (0)
  • $12.99
  • + learn more