Construction Study guides, Class notes & Summaries

Looking for the best study guides, study notes and summaries about Construction? On this page you'll find 35216 study documents about Construction.

Page 3 out of 35.216 results

Sort by

Exam (elaborations) ISC3701 Assignment 2 due 14 May 2024 •	Course •	ISC3701 - Instructional Studies In Context •	Institution •	University Of South Africa (Unisa)
  • Exam (elaborations) ISC3701 Assignment 2 due 14 May 2024 • Course • ISC3701 - Instructional Studies In Context • Institution • University Of South Africa (Unisa)

  • Exam (elaborations) • 11 pages • 2024
  • Exam (elaborations) ISC3701 Assignment 2 due 14 May 2024 • Course • ISC3701 - Instructional Studies In Context • Institution • University Of South Africa (Unisa)
    (1)
  • $2.50
  • 3x sold
  • + learn more
Summary articles Test Construction (PSMM-6)
  • Summary articles Test Construction (PSMM-6)

  • Summary • 11 pages • 2023
  • This summary contains the articles that must be learned for the Master Psychology course Test Construction at the University of Groningen. See the first page for a table of contents. Good luck with studying! :)
    (0)
  • $3.91
  • 3x sold
  • + learn more
Final Test 510 Construction Industry  (questions and answers)complete
  • Final Test 510 Construction Industry (questions and answers)complete

  • Exam (elaborations) • 6 pages • 2023
  • Available in package deal
  • Osha's mission - To protect the safety and health of Americas workers Horizontal - Some standards are horizontal meaning general or across the board, when there is no vertical. Vertical - apply to specific industry (construction) Worker right- Workers have the right to safety and health without the fear of punishment - Section 11 (c) of the Osha act Competent person - One who is capable of identifying existing and predictable hazards in the surroundings or working conditions that are uns...
    (0)
  • $3.99
  • 1x sold
  • + learn more
Unit 4 Construction Technology Unit 4 Construction Technology
  • Unit 4 Construction Technology

  • Essay • 24 pages • 2022
  • Summarise the design and construction of external works on new construction projects. Explain the use of Sustainable Urban Drainage Systems within new construction projects. Discuss the design and construction of external works for new construction projects including the incorporation of a Sustainable Urban Drainage System. Analyse the design and construction of external works for new construction projects including the incorporation of a Sustainable Urban Drainage System.
    (1)
  • $9.78
  • 7x sold
  • + learn more
Oregon Construction Contractors CCB Test 2022 (verified answers)
  • Oregon Construction Contractors CCB Test 2022 (verified answers)

  • Exam (elaborations) • 57 pages • 2022
  • Oregon Construction Contractors CCB Test 2022 (verified answers)
    (3)
  • $12.99
  • 7x sold
  • + learn more
OSHA 30 Construction Test Answer Key (Latest 2023 - 2024) Complete Answers 100% Correct
  • OSHA 30 Construction Test Answer Key (Latest 2023 - 2024) Complete Answers 100% Correct

  • Exam (elaborations) • 8 pages • 2023
  • OSHA 30 Construction Test Answer Key (Latest 2023 - 2024) Complete Answers 100% Correct 1. The CFR Parts, such as Part 1926 for Construction, are further broken down into , which group together specific and detailed standarts. A. Bullets B. Pieces C. Slices D. Subparts Answer: D. Subparts (correct answer) 2. 1. When the employer receives an OSHA citation, it must be: A. Contested and filed with the courts B. Copied and mailed to each worker C. Posted for 3 days or until the violati...
    (0)
  • $7.99
  • 1x sold
  • + learn more
OSHA 30 Construction Test Answer Key MANAGING SAFETY AND HEALTH Already Graded A
  • OSHA 30 Construction Test Answer Key MANAGING SAFETY AND HEALTH Already Graded A

  • Exam (elaborations) • 31 pages • 2022
  • OSHA 30 Construction Test Answer Key MANAGING SAFETY AND HEALTH Already Graded A IIPP is an acronym for ______________________. A. Incident Program Plan B. Injury and Impairment Planning Program C. Injury and Illness Prevention Program D. None of the above C. Injury and Illness Prevention Program (correct answer) Get OSHA 30 Exam Passed - OSHA recognizes that the implementation of a safety and health program as a way of demonstrating ____________ in promoting workplace safety and health. ...
    (1)
  • $9.49
  • 1x sold
  • + learn more
OSHA 30 Construction Test Answer Key MANAGING SAFETY AND HEALTH  Q&A 100% SOLVED
  • OSHA 30 Construction Test Answer Key MANAGING SAFETY AND HEALTH Q&A 100% SOLVED

  • Exam (elaborations) • 18 pages • 2024
  • OSHA 30 Construction Test Answer Key MANAGING SAFETY AND HEALTH Q&A 100% SOLVED
    (0)
  • $8.49
  • 1x sold
  • + learn more
OSHA 30 Construction Test Answer Key FALL HAZARDS ClickSafety Redvector - Flash Cards
  • OSHA 30 Construction Test Answer Key FALL HAZARDS ClickSafety Redvector - Flash Cards

  • Exam (elaborations) • 25 pages • 2023
  • Available in package deal
  • Three major components of a Personal Fall Arrest System (PFAS) include; anchor and the anchorage connector; full body harness; and: A. Optional body belt B. Connecting device (lanyard with shock absorber/retractable lifeline, snap hooks) C. Anti-jerk cord D. Any of the above - B. Connecting device (lanyard with shock absorber/retractable lifeline, snap hooks) (correct answer) Get OSHA 30 Exam Passed - Every supported scaffold and its components must support, without failure, its own weig...
    (0)
  • $18.49
  • 1x sold
  • + learn more