Construction Study guides, Class notes & Summaries
Looking for the best study guides, study notes and summaries about Construction? On this page you'll find 35216 study documents about Construction.
Page 3 out of 35.216 results
Sort by
-
Exam (elaborations) ISC3701 Assignment 2 due 14 May 2024 •	Course •	ISC3701 - Instructional Studies In Context •	Institution •	University Of South Africa (Unisa)
- Exam (elaborations) • 11 pages • 2024
-
- $2.50
- 3x sold
- + learn more
Exam (elaborations) 
ISC3701 Assignment 2 due 14 May 2024 
•	Course 
•	ISC3701 - Instructional Studies In Context 
•	Institution 
•	University Of South Africa (Unisa)
-
Summary articles Test Construction (PSMM-6)
- Summary • 11 pages • 2023
-
Available in package deal
-
- $3.91
- 3x sold
- + learn more
This summary contains the articles that must be learned for the Master Psychology course Test Construction at the University of Groningen. See the first page for a table of contents. Good luck with studying! :)
-
Final Test 510 Construction Industry (questions and answers)complete
- Exam (elaborations) • 6 pages • 2023
- Available in package deal
-
- $3.99
- 1x sold
- + learn more
Osha's mission - To protect the safety and health of Americas workers 
Horizontal - Some standards are horizontal meaning general or across the board, when there is 
no vertical. 
Vertical - apply to specific industry (construction) 
Worker right- Workers have the right to safety and health without the fear of punishment - 
Section 11 (c) of the Osha act 
Competent person - One who is capable of identifying existing and predictable hazards in the 
surroundings or working conditions that are uns...
-
Unit 4 Construction Technology
- Essay • 24 pages • 2022
-
- $9.78
- 7x sold
- + learn more
Summarise the design and construction of external works on new construction projects. 
Explain the use of Sustainable Urban Drainage Systems within new construction projects. 
Discuss the design and construction of external works for new construction projects including the incorporation of a Sustainable Urban Drainage System. 
Analyse the design and construction of external works for new construction projects including the incorporation of a Sustainable Urban Drainage System.
-
Oregon Construction Contractors CCB Test 2022 (verified answers)
- Exam (elaborations) • 57 pages • 2022
-
- $12.99
- 7x sold
- + learn more
Oregon Construction Contractors CCB Test 2022 (verified answers)
-
OSHA 30 Construction Test Answer Key (Latest 2023 - 2024) Complete Answers 100% Correct
- Exam (elaborations) • 8 pages • 2023
-
Available in package deal
-
- $7.99
- 1x sold
- + learn more
OSHA 30 Construction Test Answer Key (Latest 2023 - 2024) Complete Answers 100% Correct 
 
1. The CFR Parts, such as Part 1926 for Construction, are further broken down 
into , which group together specific and detailed 
standarts. 
A. Bullets 
B. Pieces 
C. Slices 
D. Subparts 
Answer: D. Subparts (correct answer) 
2. 1. When the employer receives an OSHA citation, it must be: 
A. Contested and filed with the courts 
B. Copied and mailed to each worker 
C. Posted for 3 days or until the violati...
-
OSHA 30 Construction Test Answer Key MANAGING SAFETY AND HEALTH Already Graded A
- Exam (elaborations) • 31 pages • 2022
-
Available in package deal
-
- $9.49
- 1x sold
- + learn more
OSHA 30 Construction Test Answer Key MANAGING SAFETY AND HEALTH Already Graded A 
IIPP is an acronym for ______________________. 
A. Incident Program Plan 
B. Injury and Impairment Planning Program 
C. Injury and Illness Prevention Program D. None of the above C. Injury and Illness Prevention Program (correct answer) 
Get OSHA 30 Exam Passed - 
OSHA recognizes that the implementation of a safety and health program as a way of demonstrating ____________ in promoting workplace safety and health. 
...
-
OSHA 30 Construction Test Answer Key MANAGING SAFETY AND HEALTH Q&A 100% SOLVED
- Exam (elaborations) • 18 pages • 2024
-
Available in package deal
-
- $8.49
- 1x sold
- + learn more
OSHA 30 Construction Test Answer Key MANAGING SAFETY AND HEALTH Q&A 100% SOLVED
-
OSHA 30 Construction Test Answer Key FALL HAZARDS ClickSafety Redvector - Flash Cards
- Exam (elaborations) • 25 pages • 2023
- Available in package deal
-
- $18.49
- 1x sold
- + learn more
Three major components of a Personal Fall Arrest System (PFAS) include; anchor and the 
anchorage connector; full body harness; and: 
A. Optional body belt 
B. Connecting device (lanyard with shock absorber/retractable lifeline, snap hooks) 
C. Anti-jerk cord 
D. Any of the above - B. Connecting device (lanyard with shock absorber/retractable lifeline, 
snap hooks) (correct answer) 
Get OSHA 30 Exam Passed - 
Every supported scaffold and its components must support, without failure, its own weig...
-
Construction Documents
- Package deal • 6 items • 2023
-
- $22.49
- 1x sold
- + learn more
Construction Contracts Midterm Study Guide (A+ Graded already)
Specifications - Final Exam (100% correct answers)
Construction Documents Exam 2 (with complete solutions)
CDT Key Terms (A+ Graded already)
CSI CDT Exam (with 100% correct answers)
Proprac Exam (with complete solutions)